Skip to Content
Manta Logo Manta Home
About

We are a privately held company in Mobile, AL proudly doing business for 16 years.

Similar Businesses
Mixon Foundation and Crawlspace Repair
Semmes, AL
Shurley Its Clean LLC
Mobile, AL
Bosarge Interiors
Mobile, AL
Water heater Contractor
Daphne, AL
Reviews (1)
1.0
Write a Review
M Y
· Sep 09
JOB: Start Date- 04-04-24 / 06-26-24. Remove Beveled Porcelain Floor Tile & Rotten Subfloor; Level Floor in Bathtub & Toilet Area w Hydraulic Jack; Install New Subfloor & Ceramic Floor Tile in Tub & Toilet Area. Remove Porcelain Wall Tile, Water Resistant Cement Backer Board & Mold Moisture Resistant Sheetrock in Bathtub Faucet Area & Behind Toilet Wall; Install New Wall Tile. Refinish Bathtub. Remove Old & Install New Tub/Shower Head, Faucet & Tub Drain. ISSUE / DISPUTE: Shoddy & Unskilled Workmanship; Property Damage; Negligence *Floor: Floor Not Leveled- Installed Floor Tiles on unlevel floor; Uneven spacing range 3/8"-5/8": said he used fingers because he didn't have spacers; Tile Installed 3/8"-3/4" from Side of Bathtub; Dirty Trenched Caulk and Epoxy Drips In Trench; Unlevel & Lipped Tiles are a Safety Hazard; Tile not Installed over Toilet Flange and Water Supply Line; Trenched and Broken Grout; Used Silver Grout & Grey Mortar in Grout Lines; Floor open behind toilet wall & side of Face bowl Cabinet; Discovered Broken & Pieced Together Beveled Designer Porcelain Floor Tiles w White Silicone Caulk *Wall: Unlevel Tile Installation; Improper Wall Tile Installation- did not use Mortar; Installed w White Silicone Caulk which is not an adhesive; Grout on Existing Wall Tile is Gray; New & existing Designer Porcelain Wall Tiles broken & pieced together; Ungrouted Wall Tiles *Bathtub: unable to use to from April 4, 2024, to date due to rough, prickly & gritty texture; Epoxy Runs, Smears & Bubbles inside & outside of Tub, Paintbrush Hairs on Tub Surfaces *Violated OSHA safety- no ventilation- exposed me to Dangerously Toxic Epoxy Chemical fumes *Cleanup: didn't clean adhesive, smeared & spilled grout, mortar & epoxy from Wall & Floor Tiles; Trenched Caulk Tacky and Catching Dirt *Disposal: did not seal & dispose Chemically Toxic product Kit / supplies per Tough As Tile Manufacturer's Instructions- left on Bathroom Floor & Counter *Materials: Unauthorized use of Porcelain Tiles Unrelated to Job and Did Not Replace As Agreed *Emptied leftover Mortar on front patio edge & sidewalk
Updated Sep 11
Detailed Information
  • Location TypeSingle Location
  • Opening Date2010
  • Annual Revenue Estimate81000
  • SIC Code show
  • Employeesunknown
  • Contactsshow
Is this your listing?

Duff Contractors is an unclaimed page. Claim it for free to:

Update listing information

Respond to reviews

Add business hours, photos and much more